Friday, 16 January 2015

sugar 2 shoot 2



Due to the camera failing on our shoot we were left with few cutaways. We cobbled together another shoot in the film studio to film some emergency cutaways. I stayed up most of the night cutting a zugarteck logo out of mounting board. I managed to get the hopper into my car, gathered props and costume and arrived at college where the crew were waiting.
I think that the shot of Liam filling the Hopper probably works better than it would have at the original shoot due to the angle that it was filmed where Liam was able to lean right into it, which it wouldn’t have been possible due to it being mounted to its assembly at Toms shoot.
The zugartech Logo effect also worked well, brushing salt over the logo which filled the cavities in the lettering.
Unfortunately the action on sugar web address was not as effective as with no guides on the makeshift conveyor belt, there was too much movement.
The day was successful in that we got our cutaways for Richard to play with in the edit but inconsistencies were apparent from the original shoot leaving it all a little bit of a compromise.




No comments:

Post a Comment